Manufacturing Assessment

Struggling with output, capacity or delivery? Find out what's holding your operation back — in one focused day, at no cost.

I identify the constraints limiting your manufacturing performance, pinpoint lost capacity and prioritise the improvements that will make the biggest difference to output, delivery and cost.

The approach

We combine practical shop-floor analysis with proven lean tools to give you a clear picture of your current performance, where the bottleneck is and what to do next.

One focused day on-site
Concise written report
Prioritised action plan
Completely free of charge

The methodology

From insight to improvement

A focused, one-day diagnostic to identify capacity constraints, establish baseline performance and deliver a prioritised plan to improve throughput, delivery and productivity.

1

Value Stream Mapping

Establish the baseline

  • Map the flow from raw material to finished goods
  • Record process times, queues, WIP, staffing and shifts
  • Identify potential constraints

Output

Current-state value stream map, lead-time picture and initial bottleneck hypothesis.

2

QCDS Performance Analysis

Quantify the losses

  • Assess seven key operational measures
  • Compare actual performance with targets and demand
  • Identify where losses affect total good-output capacity

Output

Performance baseline, quantified gaps and evidence-based view of the constraint.

3

Bottleneck Activity Sampling

Investigate capacity loss

  • Observe the constraint at regular intervals
  • Record how time is used (productive, waiting, stoppages, changeovers, quality, etc.)
  • Establish the true cause of lost capacity

Output

Activity profile, principal capacity losses and opportunities to increase throughput.

4

Report & In-Person Feedback

Turn insight into action

  • Consolidate the evidence and validate findings
  • Present the current-state map and baseline
  • Share prioritised recommendations and next steps

Output

Concise report, baseline dashboard, priority actions and next steps.

The one-day schedule

A structured day to maximise value and deliver clear results

Every hour is purposeful. By the end of the day you have evidence, analysis and a clear picture of what to do next.

08:00 – 08:30

Opening meeting,objectives & tour

Confirm business priorities, product mix, demand, shifts, delivery issues and known constraints. Site tour and familarisation.

08:30 – 10:00

Current-state VSM and process walk

Map flow, capture key data and identify potential constraints and baseline throughput.

10:00 – 11:00

Seven-measure QCDS diagnostic

Review actual results, targets and trends. Identify where losses affect good-output capacity.

11:00 – 12:00

Validate the bottleneck and baseline

Check queue build-up, starvation, blocking and available operating time. Select the constraint for detailed observation.

12:00 – 14:00

Bottleneck activity sampling

Observe and record how time is used at the constraint (including normal operating conditions and product mix).

14:00 – 15:00

Analysis and opportunity quantification

Calculate activity proportions, assess recoverable capacity and identify root causes.

15:00 – 16:00

Report preparation and in-person feedback

Present findings, baseline and prioritised actions to the management team.

The seven measures (QCDS)

A complete view of operational performance

We assess seven key operational measures, looking at how they work together to impact overall performance.

1

Delivery schedule adherence

Actual vs planned output and delivery

2

Non-right-first-time (NRFT)

Defects, rework and scrap

3

People productivity

Output relative to labour input

4

Value added per person

Value created relative to workforce

5

Overall equipment effectiveness (OEE)

Availability, performance and quality losses

6

Stock turns

Consumption or cost relative to stock

7

Floor space utilisation

WIP density and usable capacity

What you'll receive

A concise, practical report with clear insights and actions

Not a thick deck of slides — a focused document you can act on immediately.

1

Current-state VSM

Material flow, process times, queues, WIP and lead-time observations.

2

Baseline performance dashboard

Seven measures showing actual performance, targets, gaps and data limitations.

3

Bottleneck analysis

Identified or provisional constraint, supporting evidence and impact on throughput and delivery.

4

Activity sampling results

Breakdown of observed time, principal losses and potential recoverable capacity.

5

Prioritised improvement plan

Actions ranked by throughput impact, business benefit, implementation effort, cost and risk.

How we prioritise opportunities

Every opportunity assessed against five criteria

We'll distinguish between immediate actions, short-term projects and longer-term capital or engineering changes.

Throughput impact

How much additional good output?

Delivery impact

Improve schedule adherence, overtime or lead time?

Quality impact

Reduce defects, scrap or rework?

Financial benefit

Labour, overtime, material or working capital.

Ease of implementation

Time, cost, resources and risk.

The result

A clear understanding of your manufacturing performance and a focused plan for improvement

Higher throughput and capacity utilisation
Improved delivery and schedule adherence
Reduced waste, rework and costs
Better use of people and equipment
A practical, prioritised improvement plan

Free — no obligation

Ready to find out what's holding your operation back?

Get in touch to arrange your free Manufacturing Bottleneck & Delivery Assessment. One day. No cost. Clear answers.